Accu-Chek Aviva Información técnica Pagina 22

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 21
Alternative Site Testing (AST) (continued)
Chapter 2 20
You need the meter, a test strip, a lancet device with a drum loaded, and the clear AST cap.
1. Prepare your lancet device.
2. Insert a test strip into the meter
in the direction of the arrow.
The meter turns on.
3. Make sure the code number on the display
matches the code number on the test strip
container. If you miss seeing the code
number, remove the test strip and reinsert
it into the meter.
Vista de pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 67 68

Comentarios a estos manuales

Sin comentarios